I was reminded this morning that it had been quite a while since I made an update. I was going to wait until I got more pictures of the progress but I thought I'd do a small post now. In looking through the thread, the last two pages don't have very many pictures at all so I'm going to try to add more in the next few posts.

I may not have posted anything in a month and a half but I have been getting things done. As I mentioned earlier, I've been doing small fabrication tasks and other minor things that have taken quite a bit of time but good progress has been make. The VSS mount is done finally. That took longer than anticipated but needed to be done. Also got the firewall modification for the PCM wiring harness pass through done as well. The cover plate for the right hand drive brake/clutch pedal opening was modified to avoid creating another hole in the firewall. The new fuel pump was put into a VW surge tank so it should be very easy to place in the tank. Twist the existing one off and twist the new one on. Since the transmission is an inch and a half further back than it was with the V6 motor, I decided to flip the shifter shaft 180 degrees to make up the difference. Kind of hard to describe but I'll get pictures of it for the next post. It was at the rear most position that I could be comfortable with before the V8 swap so I needed to do something to offset the more rearward V8 position. While I was at it I cleaned up the shifter and lubricated it. I'm sure there is more but I can't think of anything else except for the next item I will discuss but as you can see, most of the stuff is going to be invisible on the completed car. All the fabricated stuff that was mentioned above will need to be painted which is on the top of the list for next weekend.

So I thought I'd share a screw up with you all. Back in the summer I posted about modifying my MG coolant temperature sensor to fit into the LS head. I chucked it into my drill press and used a file to carefully turn it down to the correct diameter and then put some threads on it. You can see it here.

LS4ModdedMGSensor.jpg

I thought I was really cool. It's funny how reality corrects those false impressions pretty quickly. :) So I'm installing it into the head and thought I'd give it one final twist with the wrench for good measure and this happened.

LS4BrokenSensor.jpg

Snapped the f*&ker clean off. It was quite exciting for about a half hour as I put thread sealer on the sensor and I didn't have a big enough easy out to extract it from the head. I had visions of it being stuck in the head with all the fun that would cause. I dropped what I was doing and ran to the hardware store to get a usable easy out and fortunately was able to get what was left of the old sensor out. Obviously this was the wrong approach so I had to go to plan B. The reason I tried this approach was I really didn't want to modify the head to accommodate the MG sensor. I'm trying really hard to do as little modification of things as possible. That approach adds time to the project but so be it. Anyway, what you see in the next few pictures is not an original idea. This was found in a post on the LS1Tech site and looked like a good solution to this problem and was reversible if it didn't work out.

What you're looking at is the driver's side coolant drain plug. It's quite large. It takes a 17MM male hex socket to get it off. The center of the plug was drilled out and tapped for a pipe thread. A hardware store brass fitting was drilled out and tapped for the sensor.

LS4TempSensorMod.jpg

Here it is being test fitted into the block. All that's left is cleaning up the block a little and installing it with thread sealer. Oh, the sensor wire needs to be lengthened a bit and incorporated into the wiring harness on that side of the motor.

LS4TempSensorInstalled.jpg

That pretty much does it for now. This coming weekend, now that the weather appears to be getting better, I'm going to get back to assembling the car so much more visible progress should be made.

Edit: Correct spelling errors

MGBV8

Don't use thread sealer on the entire thread. That sensor will need to ground thru the block, unless you use a two wire sensor.
Carl

BlownMGB-V8

Yeah, you know what happens next don't you? Tighten the plug just a little extra twist... ;-)

Seriously though, it's these details that make or break a conversion and that's why the 90/90 rule exists. (90% of the time to do the first 90% and 90% for the last 10%)

You're making great progress Scott. It's going to be a fine conversion.

Jim

Jim Stabe

That 90% rule is SO true. I wanted to get the car pretty much sorted out mechanically before I painted it. Got it running last May and I haven't even started the bodywork yet.

Scott Costanzo

Carl, as always, thanks for the advice. I'll make sure I've got a good ground there.

Jim B., thank you, I appreciate it.

Jim S., yeah, I find I have to adjust my thinking with these small tasks. It takes an incredible amount of time to complete them. With the bigger tasks you see more visible results which makes it feel like you're making faster progress. I'm not complaining, garage time is therapeutic for me so it's all good. I'm quite sure I'll be sorting the car for most of the summer if not longer. I'm glad Indy is so close.

MGBV8

It was meant as a reminder, Scott. I know you already knew that.  :)
Carl

Capt'n Moorgone

Scott,  Your making great headway! We all know the sorting NEVER ends with these cars!! That is what makes them so satisfying.

MGBGT?

Lookin' good Scott!!  Do you want me to help you on the car again, say in May?  Looking to give you moral & immoral support too.....

Scott Costanzo

QuoteScott, Your making great headway! We all know the sorting NEVER ends with these cars!! That is what makes them so satisfying.

Thanks Mike! Yeah, never ending. :-) I do enjoy it!


QuoteLookin' good Scott!! Do you want me to help you on the car again, say in May? Looking to give you moral & immoral support too.....


Thanks Artie! Thanks for the offer! As I mentioned before, you're welcome here anytime. I've been looking at what's left and at a high-level it looks like this:

o Finish assembling the engine bay (which includes fabricating the accessory drive at the front of the motor)
o Assemble the interior
o Finish wiring/assembly under the car
o Drop the tank and install the fuel pump

I'm about to make another prediction so it is going to be wrong but I'm thinking that I've got about 6 or so full days of work left to get it to the point of being drivable if nothing unforeseen comes up. That should put me toward the end of April since I only get one day a week to work on the car. I made real good progress this past weekend.  There are some big unknowns to get through:

1. What will the PCM tune be like? Will it go into closed loop?
2. Are there any mechanical issues that might require pulling the motor?
3. Who knows what else major might come up?

So if 2 or 3 materialize it may be helpful if you came in. The boss says that the weekend of May 15-16-17 could work. So maybe if you tentatively pencil that date in we can discuss as we get closer?

Take care

Scott

MGBV8

QuoteLooking to give you moral & immoral support too.....

We already have that covered here, Artie!  ;)
Carl

MGBGT?

Done.  Tentatively set for 5/15,5/16 & 5/17.

Capt'n Moorgone

Scott, Get the car on the road by then, and come with us to Carlisle Kitcar Import car show that weekend ! Always a good time.
Mike

Scott Costanzo

Sounds like a lot of fun Mike. I'll let you know as things unfold with the build.

Thanks Artie!

Scott Costanzo

Good progress was made last weekend. It is going together pretty well at this point. The coolant temp sensor is installed and the wiring changes for it are complete. Carl, I did check and it's grounded to the block real well. Also finally got the exhaust gaskets Jim Stabe suggested installed. The driver's side header was straight so that was real good. Here's a picture of the gasket.

LS4ExGasketViews.jpg

Here's one of a gasket installed. Both sides are done at this point and hopefully leaks are a thing of the past now.

LS4ExGasketInstalled.jpg

Another milestone is getting the steering is back together for the first time in over a year. Here's a picture of the steering shaft in the engine bay.

LS4SteeringInstalled.jpg

This next one is of the VSS reluctor and the sensor mount. I'll get pictures of it installed before too long. As I mentioned earlier, it took more work than expected but I'm please with the result.

LS4VSS.jpg

So the plan is to get a very early start on Saturday morning to knock as many things off the list as possible. I'm going to concentrate on getting the engine bay much closer and then move to get the interior back in shape. The detailed list of tasks is still a little long but things are truly getting there now.

Jim Stabe

I love those exhaust gaskets, they will seal up anything. They squish down to 1/2 the uncompressed thickness.

Scott Costanzo

More progress over these past couple of weekends. The to do list is still a bit long but not nearly as long as it was a month ago. :) I'll start out with a couple of pictures I promised over the last couple of posts I've made. The first one is of the VSS installed. The last one is of the shifter.

LS4ShifterVSS.jpg

You can see it's an aftermarket shifter. The lever is reversible and I've put the "bend" forward so the knob is moved forward a couple of inches. The picture is after the change. I've got it in the car now but forgot to take a picture of it installed.

The engine bay is getting there. I think it looks much more complete now and I'm very pleased with it. This first picture shows the rear of the bay.

LS4EngineSide.jpg

This one shows an overhead shot.

LS4EngineOverhead.jpg

This one shows the front of the motor. It's starting to look like a complete engine.

LS4EngineFront.jpg

Much more progress was made. The underside wiring is about half routed. Next up is the battery cut off switch and redoing the battery cables. I hope to finally fix my voltage drop problem once and for all.

That's it for now. It feels like things are moving much more quickly now at least. It's fun! :)

mgb260


74ls1tr6

Very clean looking job Scott! Keep checking stuff off the list, and soon will be on the road. :)

Scott Costanzo

Thanks Jim & Calvin!

I thought I'd give a brief update from last weekend and catch up on some images I promised in earlier posts. First, here is the fuel filter installed. I got a little too close I think but it should give you an idea of what was done.

LS4FuelFiltInstalled.JPG

This next one is the shifter installed in the car. The interior looks a bit messy in the photo but it's worse in person! :) It's a couple of hours away from being put back together and cleaned up.

LS4ShifterInstalled.JPG

So most of you recall I discovered a voltage drop issue while troubleshooting a no start problem. Replacing the defective ground cable helped a whole lot but I wanted to completely update the battery wiring while I was at it. This next picture shows pretty much what was done.

LS4BatteryReWire.JPG

I used "Military" style battery terminals. It's grounded in two places now. One is on the tail housing of the transmission, the other to the body. Maybe a bit of overkill but I'm pleased with the result. I'm using 1/0 cables. I was kind of laughing to myself as I was assembling the parts. Back when I got my car in the fall of '79 one of the first things I did was replace the battery cables. The originals were crap. I screwed up and did something right and went with 1/0 cable back then. I seem to recall I got about 10' to do the job and  I was thinking that I probably gave $10-$15 for it back then. I think I gave more than $20 for the 4' I bought at NAPA last month. It was one of those reminders that times have changed a bit. Anyway the ground side is new cable and the hot side is my 36 year old "updated" cable. All the cable ends are soldered on. Oh, I finally have a battery cutoff switch installed too.

The next step is fabricating the accessory drive stuff. It's actually underway now. I'll go into much more detail in my next post. The final picture shows the radiator roughly in its final resting place. I needed to confirm there was room for what I'm planning...there was plenty.

LS4EngineRad.JPG

That's it for now. Hope everyone is having a good spring!

Edit: spelling, changed "it's" to "its"

billymgb1000

Scott I'm so excited for you to drive that baby. man the first time I drove mine it put a huge smile on my face, well that was about 12,000 miles ago and I still can't wipe it off good luck brother.

G.R.

Scott
I like your shifter. Can you share the brand and where you found it at?

It's looking good, If I were that close I wouldn't sleep until it moved on it's own power

Scott Costanzo

Thanks Bill, I'm looking forward to it too.

G.R., unfortunately I don't know the brand. I got it off of eBay 3 or 4 yrs. ago. I can tell you it isn't a name brand shifter.

In a perfect world I'd be out in the garage right now finishing it off but work and wife dictate that other things need done too. :(

Will either of you be attending the V8 meet in Indy? Hope so.

kstevusa

That shifter looks like a copy of the B&M Rippper I have.  My mounting plate is Blue, but the bend in the stick and slotted mounting holes look similar.

Scott Costanzo

Thought I'd do a very brief update. I've got a good start on the accessory drive stuff. This first picture shows the current state.

LS4AlternatorPulleyMount.jpg

Does that look like 8+ hours of work? I started with the most complex side first and as you can see it isn't nearly done yet. I'm quite pleased with the results so far. This next very bad depiction shows what the belt routing will look like. Keep in mind it really isn't to scale, just wanted to show what the end result will look like.

LS4BeltRouting.jpg

As you can see, I'll be using a jackshaft to drive the alternator and water pump. The black lines show the rear most belt/pulley which will be driven by the crank pulley. The red lines show the forward most belt/pulley which will drive the alternator/water pump. Hope that's clear.

Next steps are completing the alternator side and then the jackshaft side. I also need to fabricate a plate behind the water pump on the passenger side to securely mount the lower pulley you see there. Hope another 8 hrs. gets me close.

That's all for now. More details will follow.

Scott Costanzo

Here's another small update. Still making progress but haven't had a full day to work on the car the past couple of weeks unfortunately. The only picture to share at this point is this one.

LS4accessoriesalmost.jpg

This has been my view for the past few work sessions. All the pulleys are in place but there still is a bit of work to do. The alternator plus the two pulleys near it are pretty much lined up to the Corvette spec in relation to the water pump pulley. The pulleys on the right are placed where they will live but I need to create the spacers so they too will line up with their respective pulleys. You can see that there is plenty of work left. I find I'm spending a lot of time measuring things so it gets a little tedious at times but I'm really enjoying the challenge of building this. I got a factory belt tensioner, which I intended to use in the system but found I couldn't, to use as my starting point and am lining up all the forward pulleys to it. I ran the twine to make sure the belt routing is good. The next step is to permanently and rigidly mount the pulleys so I can determine belt lengths. I am probably looking at 2 work sessions to get it to that point. This has to be done right. That's all for now.